Orion-instruments Eclipse 705 Manual de usuario Pagina 4

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 68
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 3
1.0 QuickStart Installation
The QuickStart Installation procedures provide the key
steps for mounting, wiring, and configuring the Eclipse
®
level transmitter. These procedures are intended for experi-
enced installers of electronic level measurement instruments.
See Complete Installation, Section 2.0, for detailed installa-
tion instructions.
WARNING: The Model 7xD, 7xG, 7xR or 7xT overfill probes should
be used for Safety Shutdown/Overfill applications. All
other Guided Wave Radar probes should be installed so
the maximum overfill level is a minimum of 6" (150 mm)
below the process connection. This may include utilizing
a nozzle or spool piece to raise the probe. Consult fac-
tory to ensure proper installation.
1.1 Getting Started
Before beginning the QuickStart Installation procedures,
have the proper equipment, tools, and information available.
1.1.1 Equipment and Tools
Open-end wrenches or adjustable wrench to fit the
process connection size and type. Coaxial probe 1
1
2"
(38 mm), twin rod probe 1
7
8" (47 mm), transmitter
1
1
2" (38 mm). A torque wrench is highly desirable.
Flat-blade screwdriver
Cable cutter and
3
32" (2.5 mm) hex wrench
(Flexible probes only)
Digital multimeter or digital volt/ammeter
24 VDC power supply, 23 mA minimum
4
57-600 Eclipse
®
Guided Wave Radar Transmitter
Vista de pagina 3
1 2 3 4 5 6 7 8 9 ... 67 68

Comentarios a estos manuales

Sin comentarios